Wildlife and Roads: Decision Guide Step 2.3

Determine Configurations
2.3 Determine configuration requirements for mitigation including dimensions, materials, bottom surface, lighting, noise considerations, human use, and engineering requirements: In this step the user will work through the ecological and engineering requirements of creating the mitigation.
2.3.1: Refer to Recommendations for Configurations for Target Species
2.3.2: Identify Configuration Needs for Dual Purposes
2.3.3: Work with Engineers on Structural and Cost Constraints